Tailings, creosote corridors, spoil and disturbed slopes all have the same shape of problem — something that does not belong, and nothing growing once it is gone. KEN Reclamation keeps the two halves apart, because their evidence is not the same.
The problem
A site that closes costs less than a site managed forever. Most quotes move the material somewhere else, line it and monitor it. Revegetation is left to the end, on ground with no topsoil, in a seeding window the weather chooses.
The split
Revegetation — G.E.M.® seed
Documented. Third-party trials and Break-Thru field records.
- Evidence: E2 · Internal field record
25–50% less seed per hectare than conventional reclamation rates, published species by species.
Break-Thru published seeding-rate reductions, reclamation species.
- Evidence: E1 · Third-party validated
93% germinated by day nine in ground cycling 40–60°F, against 30% untreated.
Tests conducted by Penn State University for Tee 2 Green Inc. Reproduced on break-thru.tech.
- Evidence: E1 · Third-party validated
34% less seed sown, and 43.7% more yield than the check in the first cut of 1997.
Varieties planted and yields calculated by Legal Alfalfa Products Ltd., Legal, Alberta, 1996 and 1997.
A forage demonstration, not a reclamation trial.
- Evidence: E2 · Internal field record
Ground covered fourteen days after seeding, over fist-sized rock.
Break-Thru establishment photograph, Alberta Energy Corporation site.
- Evidence: E2 · Internal field record
Root biomass up to five times untreated seed, after ninety days.
Break-Thru root-development comparison photographs, Alix, Alberta.
A photographic comparison, not a measured trial.
Separation — D.A.P.™
Design intent. Not demonstrated on contaminated material.
- Evidence: E4 · Design intent, untested
The Density Alteration Process is designed to separate dense contaminants — metals, amalgam, dense non-aqueous liquids — from the water and silt carrying them.
Break-Thru, Reclamation & Remediation: statement of design intent.
No published influent/effluent assays. No reference installation. It does not remove dissolved nitrate.
What is on offer is a way to test it on your own material — a characterised sample, run through the process, with a full assay of both output streams before anyone commits to anything. KEN escalates every D.A.P. question to Ken.
What KEN does
- Takes the site through an intake that adapts to what it is — tailings class, creosote, amalgam silt, sewage solids, open pit.
- Computes seeding rates from the published reductions, species by species, with the cost saved.
- Refuses to advise moving contaminated material outside an agreed sampling and transport plan.